Clean Energy

Creating eco-friendly energy for a cleaner future

GS EPS realizes a sustainable future with eco-friendly energy

GS EPS makes a sustainable future with eco-friendly energy, such as LNG, biomass, and photovoltaic power generation, and also continues to develop technologies and invest in facilities to expand the transition to eco-friendly power generation for achieving Net-zero.

  • Driving greenhouse gas reduction activities
    Investment review for hydrogen-premix and carbon capture

  • Driving the biomass cogeneration plant project in the industrial complex

  • Driving Korea's first direct photovoltaic PPA business

Leading the eco-friendly power generation
with clean fuel LNG

LNG, a natural gas, is an eco-friendly fuel that induces fewer air pollutants and carbon emissions than coal and oil. GS EPS utilizes LNG as a fuel to produce green and low-carbon energy for a clean environment in the future.

GS EPS leads eco-friendly energy with a stable LNG supply and Korea's most efficient power generation

We build a stable portfolio through fuel supply contracts, including direct gas import and average rate systems.
GS EPS generates and supplies eco-friendly energy with the highest efficiency level in Korea by operating high-efficiency combined cycle power plants with a total capacity of 2,400MW.

Dangjin Unit 1
Dangjin Unit 1
  • - Korea's first private combined cycle power plant
  • - Installed capacity of supplying electricity to approximately 1.05 million households in the metropolitan area
  • - Composed of two 175MW gas turbines, one 188MW steam turbine, and two heat recovery steam generators
Installed capacity: 538MW
Dangjin Unit 2
Dangjin Unit 2
  • - A high-class efficiency domestic power plant with an installed capacity of supplying electricity to approximately 1.07 million households in the metropolitan area
  • - Composed of two 180MW gas turbines, one 190MW steam turbine, and two heat recovery steam generators
Installed capacity: 550MW
Dangjin Unit 3
Dangjin Unit 3
  • - Korea's first power plant where an H-Class gas turbine with a power generation efficiency of more than 60% was introduced (Based on lower heating value)
  • - Installed capacity of supplying electricity to approximately 800,000 households in the metropolitan area
  • - Composed of one 275MW gas turbine, one 140MW steam turbine, and one heat recovery steam generator
Installed capacity: 415MW
Dangjin Unit 4
Dangjin Unit 4
  • - Composed of an H-Class gas turbine with a power generation efficiency of more than 60%, using directly imported gas (Based on lower heating value)
  • - A highest-class efficiency domestic power plant with an installed capacity of supplying electricity to approximately 1.76 million households in the metropolitan area
  • - Composed of two 294MW gas turbines and one 315MW steam turbine
Installed capacity: 903MW

Principal of LNG combined cycle power plant

LNG combined cycle power plants burn natural gas for the first generation, and simultaneously the exhaust heat from the first step makes steam. The high-temperature and high-pressure steam spins the turbine to generate secondary high-efficiency electricity.

  • Gas turbine
  • Heat Recovery Steam Generator(HRSG)
  • Steam turbine
You can learn more about the power generation principle in the PC or Pad version.
GS EPS is looking for partners interested in the eco-friendly energy business Business inquiry